Skip to content

Custom designs

Your image. Your slab.

Found the perfect stone in a photo or a render? Send the image. We turn it into a production file of over a billion pixels for a full slab, proof it, and produce it.

How it works

  1. 01

    Send your image

    A photo, a web image or a shot of a sample slab. Tell us the slab size and where it will be used. You must hold the rights to use the image.

  2. 02

    Approve a window proof

    We first make a window image at production resolution, so you can check pattern and color on a physical proof before the full file is built.

  3. 03

    Full production file

    We build the file for the whole slab, for example 3200 × 1600 mm at 360 PPI, and up to 720 PPI when the line needs it.

  4. 04

    Production

    The slab is printed against the proof you approved and made to order, like any design in our collection.

Case

From one image to a finished slab

1
reference image
45,354 × 22,701
pixels in the production file
360 PPI
production resolution
2.88 GB
full-slab file

A customer sent one reference image of the stone they wanted. We delivered a proof, then a full-slab production file at 360 PPI, and their production line turned it into a finished slab. The file was prepared by BuildDigit, our sister studio for design files.

Evidence register

Stone palettes fit with room to spare

Stone palettes sit comfortably inside our printable color range: 64 of the 65 stone designs in our library print in range, and the only exception was a saturated turquoise test image.

Billion-pixel detail from a small image

Our AI-assisted super-resolution pipeline, tuned on real stone scans, rebuilds the fine texture a full slab needs while layout and color follow your image. You see a proof before anything is printed.

Request a quote

Three details get you a price.

Destination port, monthly volume and timing. We reply within one working day.

  1. 01Destination port Where the container goes, for example Jebel Ali or Port Klang.
  2. 02Monthly volume In square meters or number of slabs.
  3. 03Timing When you need the first container.
Request a quote